See the difference.
From overgrown spaces to visible progress. A few photo sequences that tell the story behind the work.
A first look through the project album. Captions, stages and photo sequences are based on what is visible and await owner review. “Detail” means the overall completion stage is unknown.
View the complete photo grid →Opening up a side yard
Likely before / after: the deck, satellite dish, neighboring wall and fence align in both views.
Finding the steps again
Likely progress / after: the gate, silver-leaved planting and stair position match. The first photo already shows excavation underway.
From wall preparation to tile
Likely work sequence: two stacked niches and the same tub corner connect these views. These are progress photos, not a completed shower.
Shower wall preparation
Red-coated wall boards and two recessed niches are visible before the tile goes on; the tub below is protected.
Tile installation underway
Marble-look tiles and a mosaic niche are being fitted, with tile spacers and red-coated wall areas still visible.
Mosaic niches taking shape
Marble-look wall tiles surround two stacked mosaic niches. The tub edge and tools show this is still a work site.